Appendix D – Water saving proposals

The table below outlines some projects put to the Committee to offset further reduction in SDLs by use of environmental works and measures received during this inquiry. The table is indicative only but is presented to show the array of possible savings by works and measures proposed to the Committee.

Table D.1       Water saving proposals

Project

Potential Reduction in required SDLs (GL)

 

 

Victoria

 

Lindsay-Walpolla Island.[1]

1,110 per event

Changed timing of Hume to Lake Victoria water transfers[2]

40

Target flooding from changed lake Victoria operation[3]

10

Lindsay river allowance used in a more timely way[4]

70

Conversion of Lindsay River allowance into held environmental water to allow better management.[5]

Approx. 70

Torrumbarry to Wakool bypass.[6]

Approx. 40

Red gum forests in Victoria.[7]

550 per annum

New South Wales

 

Menindee Lakes reconfiguration.[8]

100

Reconfiguration of Lowbidgee Irrigation District.[9]

100[10]

Better use of environmental flows from the Snowy Scheme.[11]

200

Murrumbidgee Computer Aided River Management System.[12]

262 to 312[13]

South Australia

 

Water Industry Alliance South Australian River Murray Improvements Program.[14]

40 over 5 years

Adelaide desalination plant.[15]

6

Reconfiguring drainage in south eastern South Australia.[16]

14 per annum

Reconfiguring Murray lakes in South Australia.[17]

63 per annum

Drainage options for southern Lagoon of the Coorong[18]

100

Real time lower lakes management.[19]

40

 

 

 

 