Recommendation 1 |
|
The Committee recommends that the facilities at Villawood Immigration Detention Centre currently known as ‘Stage 1’ be demolished as part of the current program of works. |
2.37 Under the proposal before the Committee, the ‘Stage 2’ and ‘Stage 3’ buildings are to be refurbished. The Committee held a lengthy discussion in the in-camera hearing with DOFD/DIAC as to why it was decided to refurbish rather than demolish and rebuild these facilities. The Departments assured the Committee that an appropriate accommodation outcome could be achieved by keeping the existing facilities.
2.38 However, the Committee remains concerned the limitations inherent in these buildings may constrain the refurbishment and not allow design of best practice facilities. In particular, the Committee is concerned that:
n The floorplate of the existing buildings is unchangeable, particularly in regard to window size, aspect, use of natural light, exterior views and capacity to access common-use indoor and outdoor space.
n The siting of the existing buildings results in extensive and oppressive use of fencing.
n The extensive use of demountables on site is inappropriate and as the inflexible floorplate of the existing buildings cannot be expanded may require demountables to be used in future if capacity is reached or in surge conditions.
n The ‘indicative concept design’ incorporates common room space, including kitchenette facilities on all floors and some ensuite rooms, but the dimensions of these spaces remain small and have been manipulated to fit available space rather than achieve the best outcome for residents. In surge conditions, these facilities will not meet the minimum required floor space per detainee.
n While the Committee recognises that there is an environmental and economic benefit in retaining existing structures, the level of refurbishment required and the inability to position the buildings to take maximum advantage of the environmental conditions will require in a heavy reliance on artificial heating and cooling.
2.39 The Committee was presented with indicative concept designs only for Stages 2 and 3 and as such is unable to decide whether these concerns can be adequately addressed. Therefore, the Committee cannot find that the proposed scope for Stages 2 and 3 meet the needs of the proposed redevelopment.
2.40 Accordingly, the Committee is recommending that detailed designs for Stage 2 and 3 be presented to it for approval prior to construction commencing with detail about how the above concerns are to be addressed.
2.41 In considering the detailed design, the Committee will be mindful of the space allocation per person in both regular and surge conditions. The Committee is cognisant of the difficulty that the layout of current buildings pose to the redevelopment and seeks to be reassured that the allocated space per person will allow for privacy and personal space.
2.42 Should the Committee not be satisfied with the proposed scope it may consider re-inquiring into the project pursuant to s19(1) of the Public Works Committee Act 1969.
Recommendation 2 |
|
The Committee recommends that the Department of Finance and Deregulation present the detailed design for the redevelopment of Stage 2 and Stage 3 of the Villawood Immigration Detention Facility to the Parliamentary Standing Committee on Public Works for examination prior to construction commencing. |
2.43 Currently, Stage 1 (high security) facilities have an operating capacity of 66 with capability to accommodate 100 during surge periods. Stages 2 and 3 (lower security) have an operating capacity of 292 with capability to accommodate 416 during surge periods, giving a total accommodation of 358 in normal usage and 516 during surge events.[11]
2.44 This project proposes a Stage 1 capacity of 90 and Stage 2/3 capacity of 310 giving a total operating capability of 400.[12] During surge periods, the centre proposes a surge capacity of 728 (120 in Stage 1 and 608 in Stage 2/3). Officials from DIAC stated:
In the redevelopment we would be looking at a total number—that is, the desirable peak level for the facility being 400 beds overall. For a very short period of time, allowing for having two beds in some rooms, we might be able to go up to a surge level, we estimate, of 728 beds. But we would not in any way advocate that that be maintained as ongoing. So 400 would be the ongoing bed number, and that would be the number we would look ensure so that those sorts of standards are met and would also fundamentally underpin detention values such as ensuring that people have privacy and are treated with dignity.[13]
2.45 The Committee was not able to come to a clear understanding of how surge conditions would be managed. DIAC stated:
… some of the rooms we propose to build in Villawood will be larger rooms where, if we have to go into a surge capacity, we can put in two single beds and make share rooms, depending on client profile.[14]
2.46 However, it is clear that, based on the surge capacity numbers provided, even the smaller rooms would require the addition of a bed to reach the capacity of 728 beds, significantly compromising the space available in these rooms.
2.47 The Committee recognises that surge occurs, but shared accommodation is a less than desirable outcome. In addition, the Committee is concerned that given the small rooms presented in the indicative design for Stages 2 and 3, two beds per room in surge conditions will significantly compromise the minimum space available per person.
Recommendation 3 |
|
The Committee recommends that the Department of Finance and Deregulation ensure that the detailed design for the Villawood Immigration Detention Facility address the management plan for potential surge conditions. |
2.48 The total estimated out-turn cost for this project is $186.7 million excluding GST. The Committee held an in-camera hearing on the proposed works and received further information as supplementary submissions from the Department of Finance and Deregulation (DOFD).
2.49 The Committee, in Report 5/2009, raised general concerns regarding the quality of financial information being provided in the course of inquiries. In response, DOFD provided further information relating to this inquiry. The Committee was satisfied with the scope and quality of this information.
2.50 The Committee is satisfied that the costings for the project provided to it are adequate. Nonetheless, the Committee would like to see the final costings for the project once the detailed design is finalised.
Recommendation 4 |
|
The Committee recommends that the Department of Finance and Deregulation present the final costs of the Villawood Immigration Detention Facility redevelopment project to the Parliamentary Standing Committee on Public Works for examination prior to construction commencing. |
2.51 The Committee noted in all evidence to this inquiry and throughout the site inspection, that residents, staff, departmental officers and community organisations refer to the areas within the VIDC by stages, for example, Stage 1, Stage 2 or Stage 3, with the exception of ‘Lima’ or the ‘women’s compound’. This is despite the fact that the buildings also have less institutional names, such as the ‘Shoalhaven’, ‘Hunter’ and ‘Lachlan’ buildings.
2.52 The Committee considers that the naming of areas by stage adds to the institutionalised environment of the VIDC. Noting that the VIDC is to be renamed the Villawood Immigration Detention Facility (VIDF) to provide demarcation between the new and old facility, the Committee also considers that the sections of the new VIDF should be similarly renamed and staff actively discouraged from ongoing use of the terminology ‘Stage 1, 2 and 3’ in order to reinforce the name changes.
Recommendation 5 |
|
The Committee recommends that the Department of Immigration and Citizenship rename the sections within the new Villawood Immigration Detention Facility with names that are non-institutional in nature. In addition, all staff should be actively discouraged from the ongoing use of the terminology ‘Stage 1, 2 and 3’ in order to reinforce the name changes. |
2.53 The Department of Immigration and Citizenship’s Standards for design and fitout of immigration detention facilities (the Standards) were published in October 2007 and were produced following recommendations from the Public Works Committee’s report into the Maribyrnong Immigration Detention Centre, released in March 2005 and findings of the Australian National Audit Office in Report 54, 2003/2004.[15]
2.54 The Standards apply to the design and fitout of typical 200-person-plus metropolitan IDCs, and the underlying principles apply also to ITAs (immigration transit accommodation) and IRHs (immigration residential hostels).
2.55 In general, the Committee is satisfied that the document sets good principles for the design and fitout for detention facilities and notes that the production of this document is a world-first in immigration detention. DIAC is to be commended for this.
2.56 However, the Committee does have some concerns about the capacity for the document to be used as a standard for the long term. According to Standards Australia Limited:
Standards are published documents setting out specifications and procedures designed to ensure products, services and systems are safe, reliable and consistently perform the way they were intended to.[16]
2.57 The Committee is concerned that the Standards fail to perform as a set of design standards, primarily because of the lack of mandatory language and reference to other sources of guidance for decision-making. For example:
n Some lists of requirements, for example detainee rights, are subject to qualification yet make no reference to the guidelines about how to make decisions about the curtailing of these rights, the conditions under which they might be curtailed or if, in fact, certain of these rights are absolute and not subject to qualification.[17]
n Vague adjectives are used to describe requirements rather than technical requirements easily capable of certification. For example, that detainees are ‘provided with a reasonably quiet area to sleep and rest in.’[18] To act as standards, the document should to include a specific noise limit in decibels, capable of measurement and verification so that anyone undertaking an assessment can do so in an objective manner.
n Equally, the statement ‘no razor wire, tiger tape or barbed wire is to be used’[19] conflicts with the performance criteria that ‘razor wire is to be minimised.’[20]
n The document acknowledges that there are important aspects of detainees’ needs that are not addressed such as ‘Sophisticated Higher Level Needs …creative needs, cognitive needs, need for self-expression, spiritual development, environmental stimulation.’ It is not clear whether DIAC intends to address these needs elsewhere, or amend the standards to include them.[21]
2.58 DIAC provided a copy of the Standards in to the Committee in October 2007, however the Committee did not received them until it was reconstituted following the 2007 election. The Committee received a copy of the Standards in March 2008 and asked that DIAC consult with key stakeholders, including the Human Rights Commission prior to finalising the document. The Human Rights Commission confirmed that it received a copy of the Standards in July 2008 welcoming feedback but confirmed that it has no record of actually being consulted on the development of the Standards.[22]
2.59 While the Committee is pleased to note that the Standards are in place and the commitment demonstrated by officers to upholding them in the redesign of the VIDC, it considers that DIAC was remiss not to consult with key agencies during their development.
2.60 The Committee notes advice from DIAC received on 22 October 2009 that the standards will be reviewed against the Key Immigration Values (currently not included in the Standards) and key stakeholders consulted.[23]
2.61 The Committee reiterates that it is pleased that these standards have been produced; however, it would like to see the Standards strengthened and accredited by Standards Australia Limited. While DIAC is the only department that is responsible for the delivery of detention infrastructure, the Committee would like to see this document strengthened and embedded as an intrinsic part of immigration detention infrastructure delivery in Australia.
2.62 As the Committee is satisfied with the base principles set out by the Standards, it considers that this review can be undertaken concurrently with works at the VIDC.
Recommendation 6 |
|
The Committee recommends that the Department of Immigration and Citizenship refer the Standards for design and fitout of immigration detention facilities to Standards Australia Limited for review and accreditation. |
2.63 As noted above, some short-term works were approved by the Public Works Committee in 2008, primarily to improve the amenity of Stage 1, namely:
n improved security measures;
n inclusion of a high-care facility;
n improved entrance and visitor facilities;
n improvements to internal courtyard landscaping to provide increased recreational areas;
n reduction of razor wire; and
n improvements to the dormitories.
2.64 Further works were approved in September 2009, following the Committee’s inspection of the site in order to provide more amenity to the Stage 2/3 visits area and staff accommodation as well as to improve the Lima (women’s) compound. The Committee was assured that these works will integrate with the proposed refurbishment.
2.65 In addition, while at the VIDC, the Committee noted a number of infrastructure issues that need to be addressed in the short-term, namely, security of personal possessions and the use of the paging loudspeaker. The Committee raised these issues with officials at the public hearing and were assured that they would be addressed as part of the detailed design for the VIDC. However, as this work is not due for completion until 2014, the Committee is recommending that action be taken in the short-term to address these issues.
2.66 Of particular concern to the Committee were reports from detainees that they could not lock their rooms from the outside and detainees asserted that as a consequence personal items (including clothes) were regularly lost from unattended rooms.
2.67 One detainee told the Committee that he had to request his personal music player on a daily basis because he considered the risk of it being stolen if left in his room was high. Another reported having had most of his clothes stolen some weeks prior to the Committee’s visit and as a result he had limited clothing in his possession.
2.68 Secure storage is available for valuables at the front entrance to the centre although to access these belongings detainees need to request security staff to gain access. This is unacceptable in an administrative detention setting.
2.69 With the exception of some Stage 1 clients who are in upgraded rooms, no detainee has a key to their own room. Despite acknowledging that detainees have a right to personal security of their person and belongings, DIAC told the Committee:
[This will be addressed] as part of a redevelopment, looking at what key access can be had to the doors to rooms for the clients. We have not got any of that work in train at the moment. … It is not a part of the interim works we propose at this stage.[24]
2.70 Further, the Committee was told that providing each detainee with a key to their rooms was not being considered in the short-term because other security measures were being considered for the upgraded accommodation:
For example, in the Brisbane immigration transit accommodation and also, I believe, in the Melbourne immigration transit accommodation, both of which have been much more recently constructed, we use a card. A client swipes the card to gain access into their room, rather than using the key approach. I do not want to pre-empt the design solution, but those sorts of approaches would clearly be a key part of the concept we are looking at here. Again, having an electronic swipe card gives maximum flexibility, because different circumstances can be programmed to manage different risk situations.[25]
2.71 The Committee acknowledges that it may be impractical to upgrade room locks in the short-term and thus pre-empt a more appropriate, flexible and long-term security solution. However, the Committee considers that the level of personal security currently available to detainees at the VIDC is unacceptable and a breach of detainees’ rights to personal privacy.
2.72 In both the short-term in the existing facility and the in the redeveloped centre in future, all detainees must be given access at least to a locker in which to secure their personal belongings. These lockers should be in a location that is freely accessible to detainees and each detainee should hold the key to their own locker.
Recommendation 7 |
|
The Committee recommends that the Department of Immigration and Citizenship, as a matter of priority, provide each person detained at the Villawood Immigration Detention Centre with access to an adequate lockable space in which to secure their personal belongings. In addition, the Committee recommends that the Department of Immigration and Citizenship ensure that the detailed design for the new Villawood Immigration Detention Facility incorporate the capacity for each detainee to secure either their room or to secure their personal belongings in an adequate lockable space. |
2.73 On several occasions while the Committee was at the VIDC, the loudspeaker system was used to page individuals to attend the medical centre. The Committee considers that using the loudspeaker system in this manner breaches detainees’ privacy and disrupts the Centre as a whole, adding to its prison-like atmosphere.
2.74 Detainees also raised this matter with the Committee as did the Little Company of Mary who noted that the loudspeaker disrupted religious services. The Little Company of Mary sought assurances that future facilities utilised for religious services be isolated from the noise of the loudspeaker system.[26]
2.75 DIAC responded that:
I think the problem is that the buildings are so dislocated and away from everywhere else, and that was seen as the best way of getting clients together. We certainly hope to look at the options available in the new setting and come up with a better way of looking after client needs.[27]
2.76 Finance assured the Committee that this issue would be addressed in the detailed design phase of the redevelopment and the loudspeaker system would be limited to use for emergency announcements only.[28]
2.77 However, it is inappropriate that the loudspeaker system be used to make personal announcements to individuals, particularly when these announcements concern personal matters such as attendance at medical appointments. The Committee considers it possible to implement an alternative method of contacting detainees. Indeed, at the site inspection, the Committee was advised that the majority of detainees have access to a mobile telephone.
2.78 The Committee therefore recommends that the practice of using the loudspeaker system to page individuals should cease as soon as possible and that DIAC should implement a new method of contacting detainees that respects their right to privacy.
Recommendation 8 |
|
The Committee recommends that the Department of Immigration and Citizenship cease the use of the loudspeaker system to page detainees at the Villawood Immigration Detention Centre as soon as possible and implement a method of contacting detainees that respects their right to privacy. |
2.79 Both the detainee group and submissions to the inquiry raised a number of other issues regarding the amenity of the VIDC. The Committee considers that these issues need to be addressed in the detailed design.
2.80 Detainees told the Committee that an issue with the current design was that there was no quiet space to meditate, pray, or ‘just be alone.’ The Little Company of Mary reiterated these concerns and noted that religious observance is an important component of spiritual support for those ‘struggling with issues of asylum or repatriation.’[29]
2.81 The Little Company of Mary further submitted that common room space to be used for religious services needs to be constructed of materials such that to isolate it from the general noise of the facility and that Stage 1 detainees also need access to this space.
2.82 When at the Maribyrnong IDC, the Committee was told that detainees consistently ask for an area of garden to grow vegetables and while this was provided, its use was limited due to water restrictions.
2.83 At the VIDC, detainees also told the Committee that they would like to be able to grow vegetables. In addition, one detainee noted the proposed landscaping was essential to block out the fences, and in his opinion would be a significant contributor to breaking down the institutionalised behaviour apparent in the Centre.
2.84 The Committee considers that both landscaping and the provision of gardens as recreation for detainees is highly desirable, but notes that, like Melbourne, Sydney also has had prolonged water restrictions. The Committee also notes that underground water storage tanks are proposed as part of the stormwater management system. However, water tanks exclusively for the use of landscaping and gardens should be included in the detailed design.
2.85 The Bankstown City Council raised concerns about the introduction of new security measures and the continued housing of individuals with criminal records at the VIDC.
2.86 The Committee supports the use of less imposing security measures as put forward by DOFD/DIAC. The Committee also notes that all detainees at the VIDC are held as administrative detainees under the Migration Act 1958. Any detainees with criminal records have completed their sentence and would otherwise be released into the community.
2.87 However, the Council’s concerns reflect those of the local community and therefore the Committee considers it necessary for DOFD/DIAC to engage the local community regarding the proposed redevelopment.
2.88 The Bankstown City Council also raised concerns about an increase in noise, traffic and light spillage in the area during construction and as an ongoing concern for proposed residential developments neighbouring the VIDC. The Committee notes that DOFD/DIAC has stated that they will consult with the Bankstown City Council about the management of these issues.[30] However, the Committee considers that it is DOFD/DIAC’s responsibility to also keep the local community informed about these issues throughout the redevelopment.
2.89 Further, the Bankstown City Council noted that it has management plans in place regarding the following issues:
n stormwater management;
n Bankstown Biodiversity Corridor Strategy; and
n heritage conservation management.
2.90 All redevelopment plans for the VIDC should be consistent with those in place for the local area.
Recommendation 9 |
|
The Committee recommends that the Department of Finance and Deregulation and the Department of Immigration and Citizenship (DOFD/DIAC) ensure that the local community is kept informed about security, noise, traffic and light management at the Villawood Immigration Detention Facility (VIDF) site throughout the redevelopment. Further, the Committee recommends that DOFD/DIAC ensure that plans for the redevelopment of the VIDF are consistent with the stormwater, biodiversity and heritage management plans of the Bankstown City Council. |
2.91 Overall, the Committee is satisfied that this project has merit in terms of need, scope and cost, subject to the recommendations made in this report.
2.92 Having examined the purpose, need, use, revenue and public value of the work, the Committee considers that it is expedient that the proposed works proceed, subject to the recommendations made in this report.
Recommendation 10 |
|
The Committee recommends that the House of Representatives resolve, pursuant to Section 18(7) of the Public Works Committee Act 1969, that it is expedient to carry out the following proposed work: redevelopment of the Villawood Immigration Detention Facility. |
Senator the Hon. Jan McLucas
Chair
19 November 2009